• info@mpspl.com
  • +91 99-58-028717
bioxin0011@gmail.com 27 Division, mirpur-12, pallbi.

Structural Steel Fabrication

Shop Detail Image 1
Shop Detail Image 2
Shop Detail Image 3
Shop Detail Image 4
Shop Detail Image 5
Shop Detail Image 6
Shop Detail Nav Image 1
Shop Detail Nav Image 2
Shop Detail Nav Image 3
Shop Detail Nav Image 4
Shop Detail Nav Image 5
Shop Detail Nav Image 6

Structural Steel Fabrication

Modern Prefab Systems started it is Structural Steel Fabrication set up in 1997 to offer its expertise in the fabrication and installation of structural steel and plate works for various infrastructure and commercial projects.

With a production capacity of 24,000 MT per year and a plant facility area of 7 Acre, Modern Prefab System’s Structural Steel Unit has been supplying fabricated structural steel for power & utility units, cement plants, Mining and Mineral Industries, Oil & Gas sectors and gained the confidence of the major EPC Contractors for the fabrication of heavy Infra-structural Steel Works like Girder Bridges, Foot Over Bridges, Canopies for Toll Plaza and Multistoried Building for fast track projects.

Modern Structural Steel utilizes the latest engineering software for Structural Steel Analysis, Connection Design, Shop Drawing Preparation and state-of-the-art CNC equipment for fabrication. The latest Radio Frequency (RF) barcoding system is also used as a means of material tracking & logistic control.

TIPS TO SAVE MONEY ON STRUCTURAL STEEL

Regular Hot Rolled Steel Plates and Sections usually cost less than Cold Rolled sections with a galvanized coating. (Typically, weathering steel is used more in transmission structures).




It is usually possible to get a better price if you order more steel at once. In this instance, if you had different structures for one location, rather than ordering separately, try to coordinate to get all the buildings together. It could save money on freight and other expenses.

Loads with over-length and over-width sections could get costly because you have to get freight permits depending on the states along the delivery route. Typically, the price for broader structures is higher than for taller buildings.


Special welding inspection requirements and tests above and beyond typical industry standards could raise the price. If the job requires third-party inspection, send the material off for testing, or else it could increase the price.


Directly embedded structures typically cost less than structures mounted on base plates as they require less material and labour. (Depending on specific requirements such as the environment, design or construction type).


Generally, having minimal detail on the structure can reduce detailing and fabrication times, and the construction weighs less, which helps cost.




For most projects using standard structures can save time and money because, over time, engineers and detailers can pull these designs, offering better lead times. which helps cost.



For Your Pre-Fabricated Steel Structure Requirements

Applications

  • +

    STEEL BRIDGES

  • +

    STEEL STRUCTURES

  • +

    STEEL FABRICATION

  • +

    STEEL BUILDINGS

  • +

    INFRASTRUCTURE

  • +

    TRANSPORT

  • +

    MINING

  • +

    ENERGY

  • +

    MEGA STRUCTURES

  • +

    PACKAGING

  • +

    INDUSTRIAL WORKSHOPS

  • +

    CUSTOMIZED PRODUCTION